Delivering Seamless HVAC Installations in Urban Settings
LIG provides expert HVAC installations specifically designed to meet the challenges of complex urban environments. Our recent project at the Arndale in Greater Manchester highlights

LIG provides expert HVAC installations specifically designed to meet the challenges of complex urban environments. Our recent project at the Arndale in Greater Manchester highlights

LIG is pleased to mark a significant milestone at our client’s solar farm in Oxford, which is now powering a state-of-the-art battery storage facility. This

Location: Peak District National Park Sector: Telecommunications Infrastructure Engineering Excellence in a Protected Landscape LIG recently completed a challenging tower decommissioning and replacement project deep

Recently, our dedicated team was onsite at Selhurst Park, London, undertaking a challenging comms room changeover for Boldyn Networks and Shared Access In-building. This task

Overview The LIG team recently completed a project for London Metropolitan University, showcasing our expertise in the safe handling of rooftop HVAC units. This project

Project Overview: LIG successfully installed three high-powered EVC chargers, overcoming logistical and site-specific challenges to deliver a seamless project on a public highway. Scope of

Project Overview: LIG delivered a complex and large-scale crane lift for our client, removing and replacing cooler units and installing a new plant room. Scope

Great day onsite at Stalybridge Cricket Club! The scope of works was to complete a Pole and Headframe install. The team worked together with our

Commhoist, a key division of Lowton Infrastructure Group (LIG), proudly announces the successful telecoms decommissioning of the temporary 77m tower at Bilsdale. This phase of

On 15th March 2024, a request was received for an antenna swap at a site in Glencairn. The scope of work involved not only the

Introduction Last week, one of our clients reached out with a challenging request: a solution for lifting 230kg steel beams. Given the weight and the

The Shared Rural Network sees the government and mobile network operators working together to bring mobile broadband to rural communities across the UK. As a

Commhoist client Magdelane approached us to remove existing telecoms equipment for the roof of the Triad Building in Bootle, Liverpool and replace with new 5G

Scope of Works Commhoist were tasked with the collection and delivery of a new 5G streetworks pole. The pole was 20m in length and therefore

Location: Bourne Water Tower – Cambridge Scope of Works: Provide MEWP with lifting arm to lift Comms pack to roof of water tower and MEWP

Last week Team Commhoist performed a demo lift of a new street works pole at Hutchinson Engineering UK. We were tasked with creating a lifting

We’ve enjoyed documenting the recent decommission of the temporary mast at Bilsdale on the North Yorkshire Moors. The particular crane used was Commhoist’s LTM1130-5.1 to

Commhoist client Magdelane approached us to remove existing telecoms equipment for the roof of the Triad Building in Bootle, Liverpool and replace with new 5G