Project Overview: LIG successfully installed three high-powered EVC chargers, overcoming logistical and site-specific challenges to deliver a seamless project on …

LIG successfully install high powered EVC chargers

Project Overview:

LIG successfully installed three high-powered EVC chargers, overcoming logistical and site-specific challenges to deliver a seamless project on a public highway.

Scope of Works:

Charger Installation:

  • Installed 3 x 150kW SWARCO chargers delivered from LIG’ stores.

Equipment Logistics:

  • Collected GRP housing from DHL Rugby.
  • Retrieved Transformer, RMU, and LV Pillar from HS&L for installation.

Site Preparation:

  • Positioned equipment on the public highway; clearance and permissions secured in advance.
  • Deployed two temporary pedestrian crossings for safe public access.
  • Conducted letter drops to inform residents.

Traffic Management:

  • Used no-parking permitted cones to ensure clear access to the site.